0
Finish Painting triangle part of the fort (upper half)
Rip out the most rotten tree and replace it with brick supports
Re-paint Bunker Room outside
Re-paint Screened in Deck outside
Clean out ALL JUNK from under the fort
• Re-insulate under the fort (where it needs it)
Main Roof - Rip off all old shingles and plywood
Main Roof - Add more 2x4 supports
Main Roof - Put on new Plywood & Shingles
Main Roof - Re-do overhang (finish it like the triangle room)
Re-Paint the outside of the 2001 Extention
• Put a roof on the shower
• Fix the shower (Water)
Rip out 2nd tree and replace it with brick supports
Rip out 3rd tree and replace it with brick supports
• Re-wire heater on deck
Finish the new window in the Triangle Room upstairs (Inside)
Clean out all cupboards and any garbage outside
Replace all lights along hydro lines with new LED ones
• Replace all Christmas C9 Bulbs around the fort with C7 LED or CFL ones
Install a new floodlight at the end of the trail
Rake all leaves into the bush
Plant grass seads - Monday
CLEAN FIREPIT and all around it too, after all garbage is burned!
Put a plywood back on the outdoor cupbords
• Put plywood around bottom of deck & Paint
Install new kitchen tap
Fix all doors, so they close!!


20
Things to do
1997, 2011 FortClub Group
Home
Home
Last Updated: Tuesday May 17th, 2011 @ 7:10PM
8
Things Done!!
Things to work on this weekend 5/20/2011
14
New Page